: : THE AUGUST 2002 FLOOD DISASTER IN DRESDEN
: : DRESDEN PROGRAM FOR THE IMPROVEMENT OF FLOOD PROTECTION



Dresden proposed its experise on strategic plans, the Dresden Program for the improvement of retention and streamflow conditions (i.e. ban of new urban development in flooding areas) and at flood protection of the inner city and other highly endangered city distrcts (i.e. by temporary or/and stationary floodwalls) in the Program plannings for different water sistems carried aut by different authorities have to fit together.
The territory concerned is the urban basin of the rivers Elba and Weisseritz and the representation develops in the territory that was flooded in 2002.

:: THE AUGUST 2002 FLOOD DISASTER IN DRESDEN


some informations

- Population: 470.000 inhabitants
- Total area: 328 km2
- Highest point: 383 m a.s.l.
- Lowest point: 101 m a.s.l.
- With 63 per cent of its area devoted to woods and green spaces, Dresden can be considered one of the greenest cities in Europe
- Flood meadows along the river Elbe covering 1,510 ha

Four flood events in Dresden
- 12.08. Flood caused by the brooks.
- 13.08. Flood of the center of the city and main station by river Weisseritz, causing bad destructions and killing people.
- 14.08. to 22.08. Flood of river Elbe.
- since 16.08.2002 Flood of groundwater
(4 m more than the highest ground water level ever measured).

Weak points in the Dresden water system
- Errors in the design of the riverbeds
- Obstacles to the streamflow
- Cross- and parallel streams
- Failure of the forecast scheme
- Defects on dikes and the riverbeds
- Building development in flooding areas


First flood: the areas flooded by Dresden brooks


Second flood: the flooding area of the river Weisseritz

 


Third flood: the flooding area of the river Elbe

Fourth flood: extensive increase of ground water level

:: DRESDEN PROGRAM FOR THE IMPROVEMENT OF FLOOD PROTECTION

Decrease in volume of damage:
- Reduction in / Restriction of the potential of damage (e.g. stop of development in areas endangered by flood, master planning)
- Reduction in / Restriction of the risk of damage (e.g improvemet of retention or water-carrying capacity, improvement in flood forecasting and defence, long term: climatic change program)

Water system of brooks
- Repair work immediately
- Permanent maintenance
- Keep open the banks by law
- Watershed management in accordance to natural conditions
- Removal of illegal buildings near rivers / in rivers
- Realization of the river development planning

Weisseritz
- Repair work of the riverbed immediately
- Protection of the main station and the center of the city
- Extension of existing riverbed
- Enlargement of existing bridges
- Improvement of retention and streamflow conditions
- Guarantee of emergency spillway in the course of historical riverbed of Weisseritz

Elbe
- Improvement of retention and streamflow conditions
- Construction and improvement of dikes
- Ban of new development in flooding areas
- Flood protection of the city and the quarter Friedrichstadt by temporary floodwalls
- Improvement of flood forecasting and warning

Groundwater
- Definition of new standard groundwater levels for important buildings
- Protection of buildings against buoyancy mainly by passive measures (controlled basement flooding)
- Protection of historical buildings by drain away of groundwater

Intersections to:
- Flood protection planning for sewage plant and sewerage
- Plan of flood disaster management
- Flood protection planning for the rivers Elbe and Weisseritz by the autorithies of Free State of Saxony
- Special flood protection for important public buildings